Friday, April 13, 2007

Endesa's Vandellos Nuclear Plant to Stop Today to Repair Electric Switch

(Bloomberg) -- Endesa SA's Vandellos nuclear power plant in Spain will halt output at about 5 p.m. today to repair a fault, the operator said in an e-mailed statement.

The plant may resume output tomorrow, said a spokesman, who declined to be named, by phone. The unit is being stopped to repair an electric switch that connects it with the high-voltage power grid.


Read more at Bloomberg Energy News

No comments: